Skip to content
(250) 391-7260 info@ssl-bc.com

2017 Kapoor Tunnel Inspections

From December 11th, 2017 to approximately December 19th, 2017 the Capital Regional District (CRD) Integrated Water Services will be transferring the source of supply for the Greater Victoria Water system from Sooke Reservoir to Goldstream Reservoir in order to inspect the Kapoor Tunnel.

As a result, low water pressure and a slight change in colour and taste may be experienced. However, no interruption in service is expected at this time. For more information visit the CRD.

Back To Top