Skip to content
(250) 391-7260 info@ssl-bc.com

2020 Kapoor Tunnel Inspections

From December 5, 2020 to approximately December 13, 2020, the Capital Regional District will be transferring the source of supply for the Greater Victoria Water system from Sooke Lake Reservoir to the Goldstream Reservoir System in order to inspect the Kapoor Tunnel.

Read more

BCUC – Stream A TES Registration

On September 4, 2018, SSL filed with the BCUC an application to register the Westhills Thermal Energy System (Westhills TES) as a Stream A Thermal Energy System (TES).  This application was made in accordance with the BCUC Thermal Energy Systems Regulatory Framework Guidelines (TES Guidelines).

Read more

Water System Upgrades

Please be advised that we will be performing maintenance work on the Westhills water system between Tuesday, December 4th and Wednesday, December 12th, 2018.

Read more

2017 Kapoor Tunnel Inspections

From December 11th, 2017 to approximately December 19th, 2017 the Capital Regional District (CRD) Integrated Water Services will be transferring the source of supply for the Greater Victoria Water system from Sooke Reservoir to Goldstream Reservoir in order to inspect the Kapoor Tunnel.

Read more

CRD Temporarily Transfers Reservoirs

From December 5, 2016 to approximately December 16, 2016, the Capital Regional District (CRD) will be transferring the source of supply for the Greater Victoria Water system from Sooke Lake Reservoir to the Goldstream Reservoir System in order to inspect the Kapoor Tunnel.

Read more
Back To Top